Frequently Asked Questions

Footing spacing depends on your beam span. With doubled 2×10 beams, typical spacing is 8–10 feet. Verify against span tables in your local building code.

Footings must extend below the frost line: 12–18 inches in the deep South, 36–42 inches in the northern US, up to 60 inches in Minnesota. Check your local frost depth.

Most jurisdictions require a permit for decks over 200 sq ft or attached to the house. Always check local code before starting.

A 12-inch diameter sonotube holds about 0.785 cubic feet per linear foot. At 42 inches deep that is 0.327 cubic feet — roughly half an 80 lb bag per footing.

Yes — Quikrete Fast-Setting can be poured dry and watered in. It reaches 50 psi in 20–40 minutes, which works well for post holes.

A well-planned deck starts with accurate footing and material estimates. Undersized footings cause settlement; undersized material orders cause work stoppages. Our deck calculators help you get both right before the first shovel hits the ground.

Important Footing Depth Requirements
  • Footings must extend below the frost line in your climate zone
  • Northern US (Zone 5–7): 36–42 inches minimum depth
  • Southern US (Zone 8–9): 12–18 inches is typically sufficient
  • Always verify frost depth requirements with your local building department

Post Sizing by Deck Height

Deck HeightRecommended Post Size
Under 8 ft4×4 (light loads) or 6×6
8–14 ft6×6
Over 14 ft6×6 or engineered post

For decks over 10 feet above grade, consult a structural engineer for post and beam sizing.

Good to know Standard Footing Diameters
  • Light loads, small deck, 6-ft spans: 10–12 inch diameter
  • Typical residential deck: 12–16 inch diameter
  • Heavy loads, hot tub, large cantilever: 16–24 inch diameter
  • A 12-inch footing at 42 inches deep requires approx. 0.327 cubic feet of concrete (about half an 80 lb bag)
Pro tip Permit Requirements
  • Most jurisdictions require a permit for decks over 200 sq ft
  • Decks attached to the house almost always require a permit
  • Check with your local building department before breaking ground